Application
Compaction of soil in trenches and foundations as well as paving applications
R72151,56 incl.Vat
In Stock
nationwide
find a branch
Compaction of soil in trenches and foundations as well as paving applications
Starting:
Move the throttle lever to the start position and lock in place
Open fuel Tap
Push Decompression lever down.
Start the engine
Operating:
The machine can move both forwards and backwards
Thickness of the layer to be compacted can be up to 250mm
Soil should be slightly moist, 6-8 passes with the machine at its normal pace will be optimal
Always run the machine at full power. Avoid over compaction
Stopping:
Losen the throttle lever and move to “”off” position
Close fuel tap
Do’s and Don’ts:
Avoid hitting the machine at adjacent structures or rocks etc.
Do not operate the machine without a recoil starter
Do not refuel the machine while operating.
Ear protection must be worn while using this equipment.
Eye protection must be worn while using this equipment.
Industrial footware with steel toecaps whould be worn while using this equipment.
Regular use of hand-arm equipment may cause injury and disability.
This equipment creates dust. Wear a suitable mask.© 2025 TURNER MORRIS | E&EO